Colour theme
Book a consultation

Choosing a Microsoft Planner plan type

Compare Planner basic and premium plans against your team's required views, licences, integrations and existing project links before changing its workflow.

Three people working around a table with laptops, including one showing a calendar.

Microsoft Planner brings several task and project experiences into one application, but the plan type still matters. A premium plan doesn’t include every behaviour of a basic plan, and a renamed application can still break existing links and workflows.

Use a small test plan to compare the features your team needs. Keep the team-task guide for day-to-day ownership and handoffs; this review is about choosing and accepting the platform arrangement.

Separate the products and plan types

Microsoft’s Planner FAQ records the retirement of Project for the web in August 2025 and its transition to Planner. It also lists September 30, 2026 as Project Online’s retirement date. Those are different services; don’t assume that one transition resolves the other’s migration work.

Planner’s basic and premium plans remain distinct. Identify the type of each existing plan and which service holds the records. Include older Project links, reports and custom applications in the inventory.

Start with the required work

Ask staff to demonstrate a normal task, a blocked task and a change to the schedule. Identify whether they need a shared checklist or dependencies, milestones and workload planning.

Write acceptance checks before trying templates. For example, a team may need to see work on a calendar, assign a prerequisite and receive an update on a phone. Those requirements can point to different capabilities.

Test with the devices and accounts the team will use. A demonstration using an administrator or trial licence can hide limitations for ordinary staff.

Compare features in both directions

Microsoft’s feature comparison lists Grid, Board and Charts in both plan types. Timeline, dependencies and critical path are premium capabilities. Schedule view and recurring tasks are listed for basic plans.

The comparison also notes conditions for premium tasks appearing in personal task views and differences in conversations. Check the current documentation and test the required behaviour in your tenant.

Don’t assume that moving to premium preserves every basic-plan feature. If a required function is missing, document an acceptable alternative before you commit to the move.

Confirm user and AI entitlements

Check the licence needed for each person to create, edit and use the required views. Microsoft distinguishes limited participation in premium plans from access to advanced capabilities.

Review AI features separately. Confirm current availability, assigned licences, administrator settings and the information the feature can use. Review proposed tasks, dates and assignments before accepting them.

Include licence changes, implementation and ongoing support in the comparison. Price the licences you’d need once the trial ends.

Microsoft says workflows built for basic plans need modification to work with premium plans. Have the integration owner test real triggers, updates and failure handling using a sample plan.

For former Project for the web records, the FAQ notes that old task links don’t automatically open the corresponding Planner task. Check links in working documents and Teams tabs, then replace those that no longer reach the intended record.

Test required reporting and exports independently. Keep a record of what can be recovered or transferred. A plan that looks the same on screen can still be missing history, attachments or links.

Finish one move before expanding

Reconcile the pilot’s tasks and records with the original. Have staff verify access, notifications and the next person’s handoff. Assign owners to outstanding limitations.

Document the chosen plan type, licences and integration requirements. Review them when Microsoft changes features or your team’s work changes.


Featured Image Credit